Phone, Telegram, WhatsApp, Viber

Seed carrots long "leader", without a core, 2 g,

$0.84
In Stock
This product has a minimum quantity of 4
Characteristics
A country
Russia
Agronomic expiration date, years
3
Ampelous
No
Curly (vines)
No
Features of growing
Open soil
...

high-yielding (6-9 kg/m2), mid-season variety. From seedlings to technical ripeness 100-120 days. Root crops of the Nantes variety, weighing 150-200. The variety is valued for excellent taste, high carotene content and good roying in the winter. We recommend covering seedlings with a film to maintain optimal soil moisture. With the development of the first two pairs of real leaves, plants are thinned out. The second thinning is carried out when the root crops are reached with a diameter of 1 cm. Survery is possible (in late October - early November) to a depth of 3 cm.

Characteristics
A country Russia
Agronomic expiration date, years 3
Ampelous No
Curly (vines) No
Features of growing Open soil
Package Color
Ripening dates Average
Sowing in the ground April
The color of the fetus Orange
The vegetation period, days 105
Variety or hybrid Variety
View Simple seeds
Write a review
Note: HTML is not translated!

There are no reviews for this product.